The contractor shall determine the site construction scheme, such as the form of outer frame, pay-off hole, pump pipe hole, etc.The construction unit determines the design nodes of the aluminum mold: whether the external wall is all cast-in-place, the window is waterproof, the wall is plaster-free, the drip line, the door lintel and the wall stack are determined by the one-time molding process.Three parties determine the final aluminum mold deepening diagram.Aluminum film implementation plan
Changes in the tooling stage will increase the time required for tooling and directly affect the delivery of the bill of materials to production.Factors affecting the production of aluminum molds are: 1, due to the total package of materials prepaid is not in place in time,
resulting in a lack of raw materials and can not be processed. 2. Extension of time caused by design changes (changes at this stage need to be charged according to the contract)Aluminum mold belongs to customized processing products, change the whole body. Usually, only partial templates and
reinforcement parts of walls, beams and plates are modified. If the control amount of templates needs to be changed at this stage, it is recommended to change within 10m².Aluminum film design and production
Factors affecting the delivery are: 1, the traffic environment 2, the necessary unloading machinery 3, weather conditions Any change in the construction phase will directly affect the construction period, and it is recommended to control the change within
5m².